Our Jacksonville team recently tackled a project at the Omni Hotel on Fernandina Beach, Amelia Island. The project showcased our team's expertise and dedication. They replaced a corroded CAT/Olympian generator with a new Gillette Genset, sounds easy enough, but read on!
Omni-Install-22-(Custom).jpg
The Challenge: Navigating Tight Spaces For A Seamless Installation

The Omni Hotel’s previous generator had suffered significant corrosion over time, with rust compromising its functionality. The hotel needed a reliable replacement, and we recommended a Gillette known for its durability and performance.

The installation site presented unique challenges. The generator was located on a slope near the hotel entrance. The genset location was between trees with no easy access point.
The only available path for the crane was a narrow sidewalk. Precise maneuvering was key for the crane operator to ensure safe and effective positioning. 
 
Expert Coordination by Chuck and Edwin

Our technicians, Chuck and Edwin, took charge of this complex operation. Their extensive experience and attention to detail were crucial in planning and executing the installation. They worked closely with the crane operator, carefully guiding the crane as it backed up into the tight space. Despite the limited room to maneuver, the team successfully positioned the crane, ensuring it was securely in place.

Seamless Execution: From Rusted Out to Refreshed

Once the crane was in position, it was time to replace the generator. The old, corroded CAT was carefully picked out of the tight spot. Now it was time to put the Gillette and move it into position. Chuck, Edwin, and the crane operator worked in perfect sync, executing the swap with precision. The new generator was smoothly lowered, fitting perfectly into the tight spot.

 A Job Well Done: Ensuring Reliable Power for the Omni Hotel

The successful installation of the Gillette Generator at the Omni Hotel is a testament to our team’s skill and professionalism. Despite the challenging conditions, the team ensured that the project was completed with detail and professionalism. They provided the hotel with a reliable power solution that will serve them well for years to come.

Conclusion: Tackling Challenges with Expertise and Precision

This project highlights Generator Source’s ability to handle even the most challenging installations with confidence and competence. Whether it’s navigating tight spaces or coordinating complex logistics, our team is committed to delivering top-notch service and reliable power solutions.

See the project for yourself on the Generator Source YouTube Channel- click here

If your business needs expert generator installation or maintenance, contact us today! In ​​​​​​Colorado, click here
In Texas, click here.
In Florida, click here.      
Maybe you need a rental? For rental information click here.
Omni-Install-18-(Custom)-(1).jpg
Story Summary

What type of generator was installed?
A new Gillette generator was installed to replace an old, corroded CAT generator.

Where exactly was the generator installed?
The generator was installed on a slope near the hotel entrance, between trees with limited access.

What was the main challenge of this installation?
The biggest challenge was the tight space and limited access. The only path for the crane was a narrow sidewalk, requiring precise maneuvering.

How did the location complicate the installation?
The generator site was on a slope between trees with no easy access point, making positioning equipment difficult.

Who led the installation?
Technicians Chuck and Edwin from Generator Source led the complex operation.

How was the old generator removed?
The corroded CAT generator was carefully lifted out of the tight spot using a crane.

How was the new generator installed?
The Gillette generator was precisely lowered into position using the crane, fitting perfectly into the tight space.

Was the installation successful?
Yes, despite the challenges, the team successfully completed the installation, providing the Omni Hotel with a reliable new power solution.

Where can I see visuals of this project?
A video of the installation process is available on the Generator Source YouTube channel.